Laying concrete blocks is a fundamental skill in construction and home improvement that empowers you to build strong, durable structures from the ground up. Whether you’re constructing a garden wall, a foundation, or a simple outdoor feature, understanding how to properly lay concrete blocks can save you time, money, and frustration. This process combines precision, patience, and the right techniques to ensure your project stands the test of time.
At its core, laying concrete blocks involves more than just stacking them like bricks. It requires careful preparation of the site, accurate mixing of mortar, and strategic placement to create a stable and level wall. Each block must be aligned correctly to maintain structural integrity and aesthetic appeal. While the task might seem straightforward, mastering the basics is essential for achieving professional-looking results.
In the following sections, you’ll discover the essential steps and tips that make laying concrete blocks manageable for beginners and seasoned builders alike. From selecting materials to finishing touches, this guide will equip you with the knowledge needed to confidently tackle your next masonry project.
Preparing the Mortar and Laying the First Course
Properly mixing mortar is crucial for strong, durable blockwork. Use a mixture of one part Portland cement, one part lime, and six parts sand, adding water gradually until you achieve a workable consistency similar to thick peanut butter. Avoid making the mortar too wet, as this reduces strength and can cause blocks to slip.
Before laying the first course, ensure the foundation is clean, level, and slightly damp to help the mortar bond. Using a mason’s line stretched between two corner stakes will keep the blocks aligned horizontally and vertically.
When placing the first block, apply a generous bed of mortar along the foundation and butter the end of the block with mortar to fill the vertical joint. Tap the block gently with a trowel handle to seat it firmly in place, checking for level and alignment. Continue laying the first course, maintaining consistent mortar joints, typically 3/8 inch thick.
Building Up Subsequent Courses
After completing the first course, begin the second by laying blocks with staggered joints for added strength. This is known as a running bond pattern, where the vertical joints in one course are offset by half a block from the course below.
Apply a bed of mortar on top of the previous course and butter the vertical ends of each block before placing them. Use a level and mason’s line to ensure each course remains straight and plumb. Adjust blocks by tapping with a rubber mallet or tapping the trowel handle on the block’s face.
Keep these points in mind when building up the wall:
- Maintain consistent mortar joint thickness both horizontally and vertically.
- Clean off excess mortar promptly to prevent hardening on block faces.
- Check alignment frequently with a level and string line.
- Use a jointer tool to smooth and compact mortar joints for weather resistance.
Cutting Blocks and Special Considerations
Sometimes blocks need to be cut to fit in corners or around openings. Use a masonry saw or chisel and hammer to score and snap blocks safely. Always wear protective goggles and gloves when cutting.
Pay special attention to these elements:
- Corners: Lay corner blocks first to establish a guide for the rest of the wall.
- Reinforcement: Insert steel rebar vertically and fill cores with grout or concrete as required for structural strength.
- Openings: Install lintels above doors and windows to support the blocks above.
Typical Mortar Joint Thickness and Block Sizes
| Joint Type | Recommended Thickness | Purpose |
|---|---|---|
| Horizontal (Bed) Joints | 3/8 inch (10 mm) | Provides uniform height and strong adhesion |
| Vertical (Head) Joints | 3/8 inch (10 mm) | Ensures proper bonding and wall stability |
Concrete blocks come in standard sizes, the most common being 16 x 8 x 8 inches (length x height x width). Adjust mortar joints accordingly to maintain consistent courses and wall dimensions.
Finishing the Wall Surface
After laying the blocks, allow the mortar to set slightly before tooling the joints with a jointer to compact and shape them. This not only improves appearance but also helps prevent water penetration.
Clean the block faces with a stiff brush and water to remove mortar smears before it hardens. If desired, apply a masonry sealer or paint once the wall has fully cured to enhance durability and aesthetics.
Proper curing is essential: keep the wall moist for several days by misting with water, especially in hot or dry conditions. This process ensures the mortar gains maximum strength and reduces the risk of cracking.
Preparing the Site and Materials
Proper preparation is critical for a durable and level concrete block structure. Begin by selecting an appropriate site that is stable and well-drained. Remove any vegetation, debris, or loose soil from the area. Excavate to the required depth, considering the footing dimensions necessary to support the block wall.
Gather all necessary materials and tools before starting the laying process:
- Concrete blocks: Choose the size and type based on structural requirements.
- Masonry mortar: A mixture of cement, sand, and water, formulated for block laying.
- Concrete footing: Poured and cured to provide a solid base for the blocks.
- Trowel: For spreading mortar.
- Level and mason’s line: To ensure blocks are laid straight and level.
- Rubber mallet: To gently tap blocks into place.
- Jointing tool: For finishing mortar joints neatly.
- Measuring tape and chalk line: To mark guidelines.
Mixing and Applying Mortar
Mortar consistency is essential for bond strength and ease of work. Follow these steps to prepare and apply mortar correctly:
- Mixing: Combine Portland cement, sand, and water in a ratio typically 1:3 (cement to sand), adding water gradually until a workable, peanut butter-like consistency is achieved.
- Testing consistency: Mortar should hold its shape without slumping when lifted with a trowel.
- Application: Use the trowel to spread a 3/8-inch thick bed of mortar on the footing where the first course of blocks will be laid.
- Butter the ends: Apply mortar on the ends (head joints) of each block before setting it adjacent to the previous one.
Setting the First Course of Blocks
The first course is the foundation of the entire wall and must be perfectly level and aligned.
- Snap a chalk line along the length of the footing to guide block placement.
- Lay the first block at one end, pressing firmly into the mortar bed.
- Continue laying blocks along the line, tapping gently with a rubber mallet to adjust position.
- Check each block for level and alignment using a spirit level and mason’s line stretched between end blocks.
- Remove excess mortar that squeezes out from joints to maintain clean lines.
Laying Subsequent Courses and Staggering Joints
After the first course is set, subsequent courses must be laid with attention to bond and structural integrity.
- Apply mortar: Spread a uniform layer of mortar on top of the completed course.
- Stagger joints: Offset vertical joints by at least half a block length to create a running bond pattern, enhancing wall strength.
- Butter ends: Continue applying mortar to the ends of each block before placing.
- Check alignment: Use a level and mason’s line to ensure each course remains plumb and straight.
- Maintain joint thickness: Keep mortar joints consistent, typically 3/8 to 1/2 inch wide.
Finishing Mortar Joints and Curing
Proper finishing of mortar joints not only improves aesthetics but also enhances weather resistance and durability.
- Tool the joints: Use a jointing tool to compress and smooth the mortar joints after the mortar begins to set but is still workable.
- Remove excess mortar: Clean off any mortar smears on the block faces using a brush or sponge before it hardens.
- Curing: Keep the wall moist for several days after laying blocks to prevent premature drying of mortar, which can lead to cracking. Cover with plastic sheeting or mist with water periodically.
Common Troubleshooting Tips
| Issue | Cause | Solution |
|---|---|---|
| Uneven or wavy wall | Incorrect use of level or mason’s line; inconsistent mortar thickness | Regularly check level and alignment; maintain consistent mortar joints |
| Mortar falling out or weak joints | Incorrect mortar mix or insufficient curing | Use proper mortar ratio; keep wall moist during curing |
| Cracked blocks or mortar | Excessive force during placement; rapid drying | Tap blocks gently with mallet; control moisture during curing |
| Blocks not bonding | Dirty or dry block surfaces; improper mortar application | Clean block surfaces before laying; apply mortar properly on beds and head joints |