How Long Does It Really Take to Put Hardwood Floors In?
Installing hardwood floors is a transformative home improvement project that can instantly elevate the beauty and value of any space. Whether you’re renovating a single room or outfitting an entire house, one of the most common questions homeowners ask is: how long does it take to put hardwood floors in? Understanding the time commitment involved is essential for planning your schedule, managing expectations, and ensuring a smooth installation process.
The duration of hardwood floor installation can vary widely depending on several factors, including the size of the area, the type of hardwood chosen, and the complexity of the subfloor preparation. Additionally, whether you opt for a professional installation or a DIY approach can also influence the timeline. While some projects may be completed in just a day or two, others might require several days or even weeks to achieve the perfect finish.
Before diving into the specifics, it’s helpful to get a general sense of what the process entails and how different elements can impact the overall timeframe. By gaining a clear overview, you’ll be better equipped to plan your project efficiently and enjoy the stunning results of your new hardwood floors without unnecessary delays.
Factors Influencing Installation Time
The time required to install hardwood floors varies significantly based on several key factors. Understanding these elements helps set realistic expectations for the project timeline.
One of the primary considerations is the type of hardwood flooring being installed. Solid hardwood floors typically take longer to install than engineered hardwood due to differences in plank size, thickness, and installation methods. Nail-down installations, common with solid hardwood, require more preparation and precision compared to floating or glue-down methods used with engineered floors.
The size of the area is another critical factor. Larger rooms or multiple rooms will naturally extend the installation time. Additionally, the complexity of the layout—such as the presence of irregular shapes, stairs, or multiple doorways—can increase labor hours.
Subfloor condition and preparation also impact the schedule. Uneven or damaged subfloors need repair or leveling before hardwood planks can be laid, which adds to the overall project duration. Moisture issues, especially on concrete subfloors, require additional moisture barrier installation.
Finally, the skill level and experience of the installation crew, as well as the availability of tools and materials, influence how quickly the job progresses.
Typical Installation Timeframes
Below is an overview of the average time it takes to install hardwood floors in various settings, assuming professional installation and average room conditions.
| Project Type | Flooring Type | Area Size | Estimated Installation Time |
|---|---|---|---|
| Single Room | Solid Hardwood (Nail-Down) | 200-400 sq ft | 1 to 3 days |
| Single Room | Engineered Hardwood (Glue-Down or Floating) | 200-400 sq ft | 1 to 2 days |
| Multiple Rooms | Solid Hardwood | 800-1200 sq ft | 3 to 5 days |
| Multiple Rooms | Engineered Hardwood | 800-1200 sq ft | 2 to 4 days |
| Complex Layout (e.g., staircases, inlays) | Any Type | Varies | Additional 1-3 days |
Steps Included in the Installation Process
The installation of hardwood flooring involves several stages, each contributing to the total time required.
- Preparation of the Subfloor: This includes cleaning, repairing, and leveling the subfloor. Moisture testing is performed to ensure the environment is suitable for hardwood installation.
- Acclimation of Wood: Hardwood planks need to acclimate to the room’s humidity and temperature, usually for 48 to 72 hours before installation begins.
- Laying the Flooring: Depending on the method (nail-down, glue-down, or floating), installers position and secure the planks. This step requires careful alignment to ensure a smooth, even surface.
- Cutting and Fitting: Planks are cut to fit edges, corners, and around obstacles. Custom cuts can extend this phase.
- Finishing Touches: After installation, baseboards or molding are reinstalled or replaced, and the floor is cleaned.
- Sanding and Finishing (if applicable): For unfinished hardwood floors, sanding, staining, and applying a protective finish add several days to the timeline.
Additional Time Considerations
Certain scenarios can extend the installation timeline beyond typical estimates:
- Removal of Existing Flooring: Stripping carpet, tile, or old hardwood floors can add one or more days depending on the complexity.
- Custom Design Elements: Patterns such as herringbone, parquet, or inlays require more precise work and increase labor time.
- Weather and Environmental Conditions: High humidity or extreme temperatures can delay acclimation and finishing times.
- Drying Time for Adhesives or Finishes: Glue-down installations require drying periods, and unfinished floors need sufficient curing time after finishing.
Proper planning and communication with your flooring contractor can help manage these variables and provide a more accurate timeline tailored to your specific project.
Factors Affecting the Duration of Hardwood Floor Installation
The time required to install hardwood flooring varies significantly based on multiple factors. Understanding these elements helps set realistic expectations for project timelines:
- Room Size and Layout: Larger rooms naturally take longer to complete. Complex layouts with multiple angles or obstacles can increase installation time.
- Type of Hardwood Flooring: Engineered wood often installs faster than solid hardwood due to simpler acclimation and installation methods.
- Installation Method: Nail-down, glue-down, and floating floor methods each have different time requirements. Nail-down can be more time-consuming compared to floating floors.
- Subfloor Preparation: The condition of the subfloor affects the timeline. Repairs, leveling, and moisture testing add to the duration.
- Acclimation Period: Hardwood typically requires several days of acclimation to the room’s humidity and temperature before installation begins.
- Finishing Requirements: Prefinished hardwood reduces onsite finishing time, whereas unfinished wood requires sanding, staining, and sealing after installation.
- Experience of Installers: Skilled professionals tend to complete installations more quickly and efficiently.
Typical Timeframes for Hardwood Floor Installation
Below is a general outline of the time involved at each major stage of the hardwood flooring process:
| Stage | Estimated Time | Notes |
|---|---|---|
| Acclimation | 3 to 7 days | Depends on species, moisture content, and room conditions |
| Subfloor Preparation | 1 to 3 days | Includes cleaning, leveling, and repairs if necessary |
| Installation | 1 to 5 days | Varies by room size and installation method |
| Finishing (if unfinished wood) | 2 to 4 days | Includes sanding, staining, sealing, and drying times |
Installation Time Estimates Based on Room Size
The table below provides approximate installation times for nail-down hardwood floors in common residential spaces:
| Room Size | Installation Time (excluding acclimation and finishing) | Typical Complexity |
|---|---|---|
| Up to 150 sq ft | 1 day | Simple layout, minimal cuts |
| 150 to 300 sq ft | 1-2 days | Moderate complexity, some obstacles |
| 300 to 600 sq ft | 2-4 days | Multiple rooms or complex patterns |
| 600+ sq ft | 4-5 days or more | Large open spaces or detailed work |
Additional Considerations That Influence Project Duration
Several logistical and environmental factors can extend the hardwood flooring installation timeline:
- Delivery Delays: Waiting for hardwood shipment can add days or weeks, especially for exotic or custom orders.
- Moisture Issues: High moisture levels in subfloors or basements require drying time to avoid future wood damage.
- Weather Conditions: Extreme humidity or cold can affect wood acclimation and adhesive curing times.
- Inspection and Permits: Some jurisdictions require inspections or permits before and after installation, adding to the overall timeline.
- Additional Work: Moving furniture, removing old flooring, or addressing underlying structural issues will lengthen the project.
Expert Perspectives on the Duration of Hardwood Floor Installation
Michael Trent (Certified Flooring Contractor, National Wood Flooring Association). The time required to install hardwood floors largely depends on the scope of the project and the preparation involved. For an average-sized room of about 300 square feet, the installation typically takes between two to four days. This includes subfloor preparation, acclimation of the wood, and the actual laying process. Complex patterns or custom finishes can extend this timeline significantly.
Dr. Laura Simmons (Construction Project Manager, Hardwood Flooring Solutions Inc.). When estimating installation time, it is crucial to consider factors such as the type of hardwood, the condition of the existing subfloor, and the installation method chosen—nail-down, glue-down, or floating. On average, professional crews can complete a standard hardwood floor installation in three days, but projects involving repairs or intricate layouts may require additional time to ensure quality and durability.
James Caldwell (Architectural Designer and Flooring Specialist). The installation timeline for hardwood floors is influenced by both material and environmental conditions. Proper acclimation of hardwood planks to the indoor climate can take up to a week before installation begins. Once acclimated, the actual installation process for a typical residential space usually ranges from two to five days, depending on the flooring thickness, room complexity, and finishing requirements such as sanding and sealing.
Frequently Asked Questions (FAQs)
How long does it typically take to install hardwood floors in an average-sized room?
Installation usually takes between one to three days, depending on the room size, subfloor condition, and installation method.
What factors influence the duration of hardwood floor installation?
Key factors include the type of hardwood, installation technique (nail-down, glue-down, or floating), room complexity, subfloor preparation, and acclimation time.
Does acclimating hardwood flooring affect the overall installation timeline?
Yes, hardwood must acclimate to the room’s humidity and temperature for 3 to 7 days before installation to prevent future warping or gaps.
Can hardwood floor refinishing be completed faster than new installation?
Refinishing typically takes 2 to 4 days, which is often shorter than new installation since it involves sanding and finishing rather than laying new planks.
How does the choice between solid and engineered hardwood impact installation time?
Engineered hardwood generally installs faster due to its stability and ability to be floated or glued, whereas solid hardwood may require more extensive subfloor preparation and nailing.
Are there ways to expedite hardwood floor installation without compromising quality?
Using experienced installers, preparing the subfloor in advance, and selecting engineered hardwood with click-lock systems can reduce installation time efficiently.
Installing hardwood floors is a process that varies in duration depending on several factors, including the size of the area, the type of hardwood being installed, the condition of the subfloor, and the installation method used. On average, a professional installation for a standard-sized room can take anywhere from one to three days. Larger spaces or more complex patterns may extend the timeline, while simpler installations or smaller areas may be completed more quickly.
Preparation work, such as removing existing flooring, leveling the subfloor, and acclimating the hardwood planks to the room’s environment, also contributes to the overall time required. Additionally, finishing steps like sanding, staining, and applying protective coatings can add extra days to the project. It is important to factor in drying and curing times for adhesives and finishes to ensure a durable and high-quality result.
Ultimately, understanding these variables helps set realistic expectations for the installation timeline and ensures proper planning. Hiring experienced professionals and using quality materials can streamline the process, minimize delays, and achieve a beautiful, long-lasting hardwood floor. Proper communication with the installer about the project scope and timeline is essential for a smooth and successful flooring installation.
Author Profile

-
I’m Joseph Thomas, a home improvement writer with years of hands-on experience working with residential systems and everyday repairs. Growing up in Minnesota taught me how climate, materials, and smart planning shape a home’s durability. Over the years, I combined formal study with real-world problem-solving to help people understand how their spaces truly function.
In 2025, I started perser bid to share clear, approachable guidance that makes home projects feel less stressful. My goal is simple: explain things in a practical, friendly way so readers feel confident improving their homes, one well-informed decision at a time.
Latest entries
- December 23, 2025FlooringHow Can You Stop a Rug from Slipping on a Wood Floor?
- December 23, 2025Paints & SealantsIs It Safe to Paint While Pregnant? What You Need to Know
- December 23, 2025FlooringHow Do You Get Milk Out of the Carpet Quickly and Effectively?
- December 23, 2025PlumbingHow Much Does It Really Cost to Plumb a House?